| |
Our
engineering department is customer driven. Utilizing the most
modern technologies and advanced CAD system design techniques,
outline drawings and wiring diagrams are produced on disc
or hard copy formats. The objective is to respond quickly
to customer requirements, often the same day via FAX, E-MAIL
and EXPRESS OVERNIGHT.
Outline drawings provide critical dimensions, weights, and
wheel loading capacities. Wiring diagrams provide electrical
specifications and other pertinent requirements. Both outline
drawings and wiring diagrams give our distributors the ability
to incorporate our products into your material handling system
with ease. Quick and accurate answers are the backbone of
our success at Electrolift.
Our
sales department is among the most knowledgeable and experienced
in the industry. New hoist applications are carefully reviewed
to make sure the correct hoist is being manufactured for a
specific application. Sales works hand-in-hand with our customers
and engineering department. Whether your needs are standard
or custom, all projects are quoted in advance in writing.
Quotations
are detailed and easy to read. Over the years, we have developed
a bulleted system to eliminate specification discrepancies.
From the time you write, fax, or phone Electrolift, until
your hoist is manufactured and installed, our objective is
to keep you informed every step of the way. At Electrolift
we leave nothing to chance. Our experienced manufacturing
personnel ensure excellence in the manufacturing of each and
every hoist.
Low Maintenance
All Electrolift hoists are low maintenance because of their
worm driven design. This design is not only simple, it offers
very high strength and durability. Our hoists have less moving
parts than other types of hoists, which translates to greater
longevity and less down time. Electrolift has built its reputation
on hoists that provide many years of worry free operation.
Fast Turnaround
Delivery time is of utmost importance to every customer. At
Electrolift we take turnaround time very seriously. While
some manufacturers take up to 16-weeks to fulfill an order
for a hoist, we can deliver most standard and custom hoists
in less than 6 weeks. This remarkable timetable resulted from
years of determination to streamline our engineering and manufacturing
capabilities to meet customer needs. Our main objective is
to get you the hoist you need, when you need it.
Tracking
Most repair part deliveries are tracked via "UPS ON-LINE".
Internal computerized tracking of all orders and "UPS
ON-LINE" tracking of shipments allows us to give you
up-to-the-minute data as to where your parts or hoist order
is at any given moment. Nothing is left to chance at Electrolift,
even after it leaves the plant.
|